The biggest mistake happens right here: thinking everything depends on the installer or technology provider when applying for a self-supply permit.
No!
The authority reviews legal documents, technical capacity, property rights, interconnection, justification of self-supply, and more.
When any of those points is weak, you get an official observation—and with it, delay.
At EEEsponda Abogados we see this pattern again and again:
- Companies with projects ready but poorly assembled paperwork.
- Installers who know electricity but not permits.
- Lease or comodato contracts poorly drafted.
- Incomplete self-supply justifications that look like disguised energy sales.
The result is always the same:
Lost time and stalled money.
A. Requirements that most often stall the process (and that we help you clear)
Here I will not give you an academic list.
I will give you practical truth:
1. The authority wants clarity
If technical documentation does not match legal documentation, they send it back.
It happens more than you think.
2. The property must be legally solid
Many projects fail because of a bad contract.
One paragraph can stop your investment.
3. You must show you are not going to sell energy
If your justification memorandum is wrong, the authority suspects.
And when it suspects, it reviews everything with a magnifying glass.
4. Interconnection without strategy = guaranteed delay
CENACE does not forgive inconsistencies.
And if you err, you go to the back of the line.
B. What we did for the director who came to us desperate
- We rebuilt his file from scratch.
- We corrected his technical description.
- We redrafted his use agreement.
- We justified self-supply under the law.
- We prepared documentation to avoid future observations.
Weeks later, his permit was approved. Today his plant is already generating power, and his CAPEX pays off from the first month.
And most importantly: he did not lose more time or money on a poorly executed procedure.
C. You can avoid the same mistake
If you are going to invest in a self-supply project—solar, cogeneration, or hybrid—this is the time to do it right.
At EEEsponda Abogados:
- We integrate your entire legal file.
- We coordinate the technical side with your provider.
- We prepare your interconnection strategy.
- We avoid observations that stall your project.
- We stay with you until you have the permit in hand.
Because it is not about installing panels…
It is about installing legal certainty in your investment.
Ready to move your self-supply project forward without risk or delays?
Write to me and we will structure your file starting today. Your project does not have to stop because of a permit procedure.